云顶国际(中国区)唯一官方网站云顶国际



Central heating project-上海云顶国际精机股份有限公司
En

Central heating project

Project Introduction

878,000 m2 heating project constructed in 2018

Eight Habell RE series new generation high efficiency air conditioning compressors are adopted to meet the temperature demand of customers. The overall operation condition is stable. The heating temperature demand is 42 for domestic water, 38.7 for hot water inlet, 43.4 for water outlet,  21.7 for hot water inlet and 15.7 for water outlet.

image.png

云顶国际